Who We serve

We provide services throughout Southern & Northern California including the high deserts. The Company undertakes both private and public work. Including factories, offices, retail units; schools, hospitals, and public buildings. RP General specializes in grading & paving, asphalt: new and repair, sealcoat, and striping, stamped and regular concrete, underground, concrete footings, additions and remodels, and masonry. RP General is a BBB A+ rated accredited business.

RESIDENTIAL

COMMERCIAL

INDUSTRIAL



SB (Micro) CERTIFIED



SBE CERTIFIED



MBE CERTIFIED

Our Services

ASPHALT PAVEMENT PRESERVATION

ASPHALT PAVEMENT PRESERVATION

-Pavement Overlay
-Fabric Overlay
-Leveling Course
-Mill & Inlay
-Micro Overlay
-ARAM Treatment

SEALANT PRESERVATION

SEALANT PRESERVATION

-Type-1 & Type-2 Road Slurry
-Fog Seal
-Crack Filler
-Seal Coating
-Chip Seal
-Scrub Seal

CONCRETE CONSTRUCTION

CONCRETE CONSTRUCTION:

-Vehicular concrete slabs
-Sidewalks
-Curbs
-Curb and gutter
-Flowline/drainage swales
-Stamped concrete
-Exposed aggregate
-Various top casting
-Footings
-Steel reimbursement
-Seat walls
-Masonry walls
-Staircases/steps
-Pavers

Pavement Reconstruction

Pavement Reconstruction

-Pavement removal
-Spot dig outs
-Full depth reclamation
-Subgrade re-construction
-Soil stabilization
-Cement treatment
-Lime treatment
-Cement treated base installation

DRAINAGE & UTILITY CONSTRUCTION

DRAINAGE & UTILITY CONSTRUCTION

-Sewer Pipeline from 4" to 102"
-Water Pipeline 1" to 102"
-Storm Drain Pipeline 4" to 144"
-Storm Drain Structures

Storm Water Pollution Prevention Plan:

Storm Water Pollution Prevention Plan:

-Slit fence
-Rock bags
-Straw wattle
-Hay bales
-Straw blanket
-Visqueen
-3” minus rock
-Stabilized construction entrance with 3” minus rock
-Street sweeping

GRADING & EXCAVATION

GRADING & EXCAVATION

-Finish/fine grading
-Rough grading
-Excavation and demolition
-Erosion control
-Weed abatement and debris removal
-Import and export

ADA REMEDIATION

ADA REMEDIATION

-Design/Build
-Curb ramps
-Truncated domes
-Switch back ramps
-Railing
-Parking stall leveling
-ADA striping and signage
ASPHALT PAVEMENT PRESERVATION
-Pavement Overlay
-Fabric Overlay
-Leveling Course
-Mill & Inlay
-Micro Overlay
-ARAM Treatment
SEALANTS
-Type-1 & Type-2 Road Slurry
-Fog Seal
-Crack Filler
-Seal Coating
-Chip Seal
-Scrub Seal
CONCRETE CONSTRUCTION
-Vehicular concrete slabs
-Sidewalks
-Curbs
-Curb and gutter
-Flowline/drainage swales
-Stamped concrete
-Exposed aggregate
-Various top casting
-Footings
-Steel reimbursement
-Seat walls
-Masonry walls
-Staircases/steps
-Pavers
PAVEMENT RECONSTRUCTION
-Pavement removal
-Spot dig outs
-Full depth reclamation
-Subgrade re-construction
-Soil stabilization
-Cement treatment
-Lime treatment
-Cement treated base installation
DRAINAGE & UTILITY CONSTRUCTION
-Sewer Pipeline from 4" to 102"
-Water Pipeline 1" to 102"
-Storm Drain Pipeline 4" to 144"
-Storm Drain Structures
STORM WATER POLLUTION PREVENTION PLAN
-Slit fence
-Rock bags
-Straw wattle
-Hay bales
-Straw blanket
-Visqueen
-3” minus rock
-Stabilized construction entrance with 3” minus rock
-Street sweeping
GRADING & EXCAVATION
Finish/fine grading
-Rough grading
-Excavation and demolition
-Erosion control
-Weed abatement and debris removal
-Import and export
ADA REMEDIATION
-Design/Build
-Curb ramps
-Truncated domes
-Switch back ramps
-Railing
-Parking stall leveling
-ADA striping and signage
Previous
Next
-Pavement Overlay
-Fabric Overlay
-Leveling Course
-Mill & Inlay
-Micro Overlay
-ARAM Treatment
-Type-1 & Type-2 Road Slurry
-Fog Seal
-Crack Filler
-Seal Coating
-Chip Seal
-Scrub Seal
-Vehicular concrete slabs
-Sidewalks
-Curbs
-Curb and gutter
-Flowline/drainage swales
-Stamped concrete
-Exposed aggregate
-Various top casting
-Footings
-Steel reimbursement
-Seat walls
-Masonry walls
-Staircases/steps
-Pavers
-Pavement removal
-Spot dig outs
-Full depth reclamation
-Subgrade re-construction
-Soil stabilization
-Cement treatment
-Lime treatment
-Cement treated base installation
-Sewer Pipeline from 4″ to 102″
-Water Pipeline 1″ to 102″
-Storm Drain Pipeline 4″ to 144″
-Storm Drain Structures
-Slit fence
-Rock bags
-Straw wattle
-Hay bales
-Straw blanket
-Visqueen
-3” minus rock
-Stabilized construction entrance with 3” minus rock
-Street sweeping
Finish/fine grading
-Rough grading
-Excavation and demolition
-Erosion control
-Weed abatement and debris removal
-Import and export
-Design/Build
-Curb ramps
-Truncated domes
-Switch back ramps
-Railing
-Parking stall leveling
-ADA striping and signage

CONTACT US FOR A
QUOTE TODAY